Dredgers 'Causeway' and 'Sospan Dau' have been hard at work 24 hours a day over the past week or so removing sand and debris from the area within the Exclusion Zone destined to be the new Marina, Marina Curve/Pier and Lock Cut into Wellington Dock. The spoil is 'dumped' on designated grounds outside the harbour. No letting up for the Easter Holiday here!
Sospan Dau
Causeway
Today saw floating crane NP 476, towed by tug 'Afon Goch', put in place along the eastern side of the Prince of Wales pier.
On shore, the rocks keep piling up beside the pier prior to work starting on the new lock to replace the exisiting lock gate and swing bridge at Union Street.