After dredging at the Port of Felixstowe for the past week and a bit the 'BARENT ZANEN' hopper dredger returned to Dover last evening to continue its operations with the sand infill areas around the DWDR site.
Pictured this morning arriving with sand from the Thames site.
Crew at the bow drop a cable that will lift the floating pipeline to connect to the ships tanks that hold the sand which is pumped out under pressure along the landside pipeline to where it is required.