Dover.uk.com
If this post contains material that is offensive, inappropriate, illegal, or is a personal attack towards yourself, please report it using the form at the end of this page.

All reported posts will be reviewed by a moderator.
  • The post you are reporting:
     
    For those interested in progress of the Western Docks Development, contractors VSBW having recently produced a Youtube drone video.

    [U]Berth A[/U] (one of two cargo berths to be put into service to discharge into the RCT (Refrigerated Cargo Terminal) is in the Inner Harbour where approx. the Hoverpad site was located, and [U]Berth C[/U] is in the outer harbour at approx. rightangles to Berth A and set against the infill area alongside the old Prince of Wales Pier.

    The RCT is the large grey building alongside Berth A.

    The '[U]Dolphin[/U]' at the end of Berth C is an isolated structure used to aid the berthing and mooring of vessels. It is connected to the land by a walkway.

    The piling for the new marina pontoon berths can be seen in one of the shots.

Report Post

 
end link