    With work continuing in the new marina and lock cut Baldwins crane was again in use a couple of days ago. This time delivering what appears to be counterbalance weights into the Bascule Bridge arms with the aid of some nifty balancing act from those engineering chaps




    At the other end of the DWDR works alongside berth A and the RCT a crane driver's cab is lowered into position on one of the towers. Hope the operator has a head for heights!




    On the new pier end the metal framework for the pavillion has started to take shape ( a long shot on a rather murky day)