    Recent views of the Western Docks Development from St Martin's battery on the Western Heights.

    The area around the new refrigeration shed ('Cargo Terminal') alongside berth 'A' (a reefer berth eventually). One of the two new container cranes can just be made out far right of shot.

    container stacking area

    Workers have been busy on the roof of the Cargo Terminal putting down a further layer of something. Might it be reflective insulation or solar panelling?

    Wellington Navigation Channel, bascule bridge over the lock cut and the new pier (getting plenty of footfall)

    As can be seen the area around the lock cut has now been mostly cleared with safety railing installed along both sides of the cut.

    Clock Tower, new marina with awaiting pontoons and the marina curve


    Panoramas of the site