    DT1 - The probems of the seafront and town being cut off is indeed a serious one. The disconnection is a result of the A20 extension to the town and the fault of the Dept Transport at the time. This was known and ideas, such as tunnelling and an alternative route (to join with the widened A2 at Lydden) were put forward. The alternative route was not a runner really, but if the tunnelling was accepted our seafront and the port would look very different today, but it was considered too costly. So not DDC's planners fault. These main through routes are not determined by local authorities.